Analisis Perencanaan Penambahan Kapasitas Generator 30MWTerhadap Aliran Daya dan Sistem Proteksi di PT Sinergy PowerSource
WRENDA WIRA PRADANA. ABSTRAK. PLTU PT Sinergy Power Source is one of the private PLTU that has capacity of 30 MW and supply 3 main expenses namely PT Mekabox, PT Sopanusa, and PTSunpaper. Currently the total load that must be fulfilled by PLTU PT SPS for thethree factories is 25.33 MW and will continue to grow because of the increase Read more